Watch: Replacement Bridge in Tayr Felsay
4/18/2026 1:07:20 PM
The engineering regiment of the Lebanese Army, in cooperation with the Litani River National Authority, has begun preparations to build a replacement bridge in the Tayr Felsay area, as an alternative to the bridge that was targeted.
In this context, large concrete pipes are being brought from the authority’s warehouses to be used in assembling and securing the bridge. The aim is to establish an alternative crossing with high capacity, allowing the passage of a large number of vehicles, thereby helping reconnect both sides of the river and facilitate the movement of residents in the area.
Watch the attached video for more.
In this context, large concrete pipes are being brought from the authority’s warehouses to be used in assembling and securing the bridge. The aim is to establish an alternative crossing with high capacity, allowing the passage of a large number of vehicles, thereby helping reconnect both sides of the river and facilitate the movement of residents in the area.
Watch the attached video for more.